EasyManua.ls Logo

Tuttnauer 1730 - Tests; Installation Tests; Periodical Tests

Tuttnauer 1730
67 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
3 TESTS
3.1 Installation Tests
The service technician shall perform the following preliminary
checks before operating the autoclave:
a. Leveling Check
Check that the autoclave is leveled.
b. Leakage current test
Check the precise operation of the earth leakage relay.
c. Continuity Check
Check the continuity of the grounding connection.
d. Safety Check
Check the safety elements; safety valve and the door locking
mechanisms.
e. Programs Check
Run basic programs of the autoclave and check the operation
sequences, the sterilization parameters etc.
f. Integrity Check
Perform a visual check to verify that there are no dents, scratches,
broken gauges, etc.
g. Validation
Validate the sterilization cycles, taking in consideration the
interface of packaging/goods/autoclave.
After the above steps are performed, the autoclave is ready for operation.
3.2 Periodical Tests
ERIOD
TEST
1 months Test the safety valve by operating it.
6 months
Remove the autoclave’s cover, tighten the heaters’ screws and
electrical connections, valves and connectors in the control box.
Check the continuity of the grounding connections.
Check the temperature and pressure calibration.
Perform validation of the autoclave.
Check the precise operation of the earth leakage relay.
Check that the autoclave is leveled.
Check the safety elements; safety valve, safety and cut-off
thermostats door locking mechanisms.
Run basic programs of the autoclave and check the operation
sequences, the sterilization parameters etc.
Check the water reservoir, piping, plastic parts and electric wires.
Check and tighten the piping joints to avoid leakage.
Check and tighten all screw connections in the control box,
heaters and valves and instrumentation.
Year
Calibrate the temperature and pressure once a year or in
reference to local rules or regulations (refer to the section on
Calibration).
5 years Observe the closing device for excessive wear
Safety tests (pressure vessel, efficiency, electrical) shall be performed in
accordance with local rules or regulations, by an authorized inspector.

Table of Contents