Operator’s Manual | Moving Floor Trailer 13
Loading and
Unloading
Operation
Loading Operation
1. Ensure that the loading location is located on hard-
packed and level ground. Then position the trailer as
desired and apply the brakes.
2. Close and secure the rear doors (Figure 01 - 2). (Refer to
Option: Barn Doors on page 31), (Refer to Option: Top
Hinge Door on page 33) Or (Refer to Option: Combo
Door on page 35)
Figure 01 - 2
WARNING
Doors must be closed and secured prior to loading trailer
from above.
3. Open the tarp (Figure 02 - 2). (Refer to Option: Manual
Roll Tarp on page 17) Or (Refer to Option: Flip-Top Tarp
on page 21)
Figure 02 - 2
4. Load the trailer.
CAUTION
Ensure the surrounding area is clear of personnel and
obstructions prior to loading the trailer.
WARNING
Do not exceed the maximum allowable GVWR / PNBE
KG and GAWR / PNBE KG as indicated on the VIN plate.
The VIN plate is located on the front driver side corner of
the trailer.
WARNING
Mechanically compressing the load may result in damage
to the trailer
5. Close the tarp. (Refer to Option: Manual Roll Tarp on page
17) Or (Refer to Option: Flip-Top Tarp on page 21)
6. Perform a pre-trip inspection.
Unloading Operation
1. Ensure that the unloading location is located on hard-
packed and level ground. Then position the trailer and
apply the brakes.
2. Deflate the suspension by turning the air spring valve
(Figure 03 - 2). The valve is located on the driver side,
along the bottom edge in front of the first axle (Figure 04
- 2).
Figure 03 - 2
Figure 04 - 2
Loading and Unloading Operation - 2