EasyManuals Logo

U-Line CLR60 User Manual

U-Line CLR60
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
INITIAL START-UP
Once installation and leveling is complete, the unit is ready for initial
start-up and operation.
1. Plug the appliance cord into a 115V polarized and grounded elec-
trical outlet.
2. Open the water supply valve in the main water source.
3. Put the cycle selector switch in the ICE position (press the switch
to the right). The water fill valve will energize and fill the water
reservoir. The water fill valve shuts off after 180 seconds. The
compressor begins to operate and water flows over the evapora-
tor assembly (ice cube tray).
4. Upon initial start-up, water flow over the evaporator may be
uneven. This may cause uneven sized cubes or water spilling into
the ice storage bin. This is a normal situation and will correct itself
within the first twenty-four hours of operation. After the initial
start-up period, the water will cascade evenly over the evaporator.
20
User’s Manual
H
D
W
UL118
Figure 26

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the U-Line CLR60 and is the answer not in the manual?

U-Line CLR60 Specifications

General IconGeneral
BrandU-Line
ModelCLR60
CategoryIce Maker
LanguageEnglish

Related product manuals