EasyManua.ls Logo

Ulvac DIS-252 - Returning to Air-Flush Closed Operation

Ulvac DIS-252
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-24-
4.2.3 Returning to air-flush closed operation
Before starting air-flush operation, first stop vacuum pump and proceed in
accordance with the following procedure. Never perform this procedure during
operation.
Remove air-muffler
Stop vacuum pump.
Remove air muffler from air-flush port.
Lightly fit plug to air-flush port with a spanner (nominal dia. 13mm).
When restarting air-flush operation, refer to 4.2.1~4.2.2[page 23] and prepare and
start.
Store removed air muffler and pay attention not to misplace it.
Air-flush port
Fit plug
Remove air
-
muffler

Related product manuals