21
Installation instructions
ENGLISH
Collectors and Gaskets
A
C
Collector mounted on the rst and last element of the ow
manifold Ø 18 (A), inside Ø 27 (B)
Gaskets mounted on all other elements (C).
3.7 - BOILER CONNECTION
The MODULEX boiler leaves the factory ready for hydraulic
(ow and return), gas connections on the left side of the boiler.
To x the ue gas exhaust manifold, use the screws and gaskets
contained in the accessory kit box and a 10 mm socket wrench.
The ue gas manifold is set-up on the LEFT SIDE, the outlet can
also be set-up on the RIGHT and REAR SIDE.
A
B