EasyManua.ls Logo

Unigas G400A - Adjusting the gas valves group and removing the filter; MultiBloc MBE MultiBloc VD Mounting

Default Icon
217 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PART IV: MAINTENANCE
41
Adjusting the gas valves group and removing the filter
MultiBloc MBEMultiBloc VD Mounting
Prese di pressione
0 Coperro
A
A
B
B
C
C
D
D
E
F
F
E
1,3,4,6 T
2 Arre
5
T
1
3
p
e
0
p
a
5
p
Br
0
3
p
e
p
a
6
5
p
Br
1
1
0
5
3
6
2
2
Prese di pressione
MB-DLE
415 - 420 B01
MB-DLE
405..412
0, 1, 2, 3, 4, 5

2
p
e
p
Br
2
p
e
3
p
a
p
Br
5
03
p
a
2
3
5
0
Check the filter at least once a year!
Change the filter if the pressure difference between pressure connection 1 and 3 (Fig. 1-Fig. 3)is p > 10 mbar.
Change the filter if the pressure difference between pressure connection 1 and 3 (Fig. 1-Fig. 3) is twice as high
compared to the last check.
You can change the filter without removing the fitting.
1 Interrupt the gas supply closing the on-off valve.
2 Remove screws 1 ÷ 4 using the Allen key n. 3 and remove filter cover 5 in
Fig. 5
.
3 Remove the filter 6 and replace with a new one.
4 Replace filter cover 5 and tighten screws 1 ÷ 4 without using any force and fasten.
5 Perform leakage and functional test, p
max.
= 360 mbar.
position
to push
1. Position VD on VB, fig. 2+3.
2. Slide VD forward up to the stop, fig. 4.
3. Screw VD on with 2 M5 screws for each, max. 5 Nm/44 in.-lb., fig. 5/6.
4. VD can be mounted rotated by 180°, fig. 7.
1
2
3
4
5
6
7

Other manuals for Unigas G400A

Related product manuals