DEEP
WELL INSTALLATION
2.
The ejector (B) has two holes in the top of it.
deep well venturi tube
until snug. Thread
smaller hole.
tighten nipple,
then tighten
wrench.
3. Thread a 1-1/4 in. male PVC adapter over the venturi
tube (D) and into ejector (B). Thread a 1 in. female
PVC adapter onto the 1 in. x 5 in. nipple. Hand tighten
adapters, then tighten 1/4 turn with pipe/adjustable
wrench.
4
4. Subtract 5 ft. from the depth of your well.
This is
the total length of PVC pipe and couplings to cement
onto both 1-1/4 in. male and 1 in. female PVC
adapters. Cement a section of PVC pipe to each
adapter, then lower the whole assembly into the well,
foot valve rst. Firmly clamp the end of the PVC pipes
with a pipe clamp to prevent the assembly from sliding
down into well. Be sure to keep track of which pipe is
the pressure pipe and which is the delivery pipe.
Lowes.com
9
2
3
1 in. x 5 in. Nipple
1 in. Female
PVC
Adapter
1-1/4 in. Male
PVC
Adapter
B
E
D
B
D
Thread
(D) (longer tube) into larger hole
1 in. x 5 in. nipple (not included) into
Only hand tighten venturi tube. Hand
1/4 turn with pipe/adjustable