EasyManua.ls Logo

UWE P90 - Page 50

UWE P90
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50
Disconnection of the head-end control leads
and hose lines
The head-end control leads and hose lines are
already demounted when the unit is delivered.
• Disconnect the BREEZE supply line (33/1) and leakage
line (33/2) so that no liquid escapes.
Disconnect the BREEZE supply line (33/1) and leakage
line (33/2) and collect any escaping liquids.
• Remove the left nuts (35/1) and (35/2) on the left
fastening plate (35/3)
• Remove the right nuts (36/1) and (36/2) on the
rightfastening plate (36/3)
Removal of the rear sheet-metal paneling on the stand
• Remove the exhaust air duct (37/2)
• Remove the left cover (37/3)
• Remove the bottom cover (37/4)
• Demount the warm air recirculation unit, removing the
screws all round (38/3) (optional)
• Remove the cover for the servomotor (38/2)
• Disconnect the control lead (38/5) (mains lead) of the
servomotor

Table of Contents

Related product manuals