EasyManua.ls Logo

Vacon 100 - Page 14

Vacon 100
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
vacon • 12 Installation of OPTBJ board
Tel. +358 (0) 201 2121 • Fax +358 (0)201 212 205
5
Unless already done for the other control cables,
cut free the opening on the AC drive cover for the
OPTBJ cable (protection class IP21).
NOTE: Cut the opening on the side of the slot E!
6
Remount the AC drive cover and run the cable as
shown in picture.
NOTE: When planning the cable runs, remember
to keep the distance between OPTBJ cables and
the motor cable at a minimum of 30 cm. It is rec-
ommended to route the OPTBJ cables away from
the power cables as shown in the picture.
11576_00

Other manuals for Vacon 100

Related product manuals