Supplied By www.heating spares.co Tel. 0161 620 6677
5
PART 1 CONCENTRIC 60/100
REQUIREMENTS
Regulations and
standards to be
observed
¤
☞ Vaillant ecoMAX/ecoTEC boilers
are certified as heating boilers
with corresponding flue systems
according to EC Directive
90/396/EEC on gas-fired devi-
ces. This installation manual is
covered by this certification and is
referred to in the design approval
test certificate.
☞ These instructions should be read
in conjunction with the instructions
for installation and servicing
supplied with the boiler.
☞ Ensure also that all legislation,
rules, regulations and directives
mentioned in the installation
instructions are observed.
☞ The installation of the boiler and
its flue must be carried out by a
competent person who is
registered with CORGI (The
Council for Registered Gas
Installers).
☞ The installation of the boiler and
flue must be in accordance with
the Gas Safety (Installation and
Use) Regulations 1998 and the
Building Regulations and
BS 5440 Part 1.
☞ The requirements for flue
termination detailed in the boiler
installation instructions must be
observed.
☞ Two types of flue system are
available for ecoMAX/ecoTEC
boilers. The standard concentric
flue system (100 mm outside
diameter) and a larger diameter
concentric system (125 mm
outside diameter) which allows
longer air/flue duct lengths to be
achieved.
☞ The air/flue duct operates at very
low temperatures therefore no
clearance is necessary between
the air duct and adjacent
services.
☞ Ensure while installation work is
being carried out that no debris
such as swarf, filings or fragments
of mortar are allowed to remain
in the air/flue duct.
834449_09GB_082006.qxd 10.08.2006 12:20 Seite 5