11Installation and maintenance manual ecoTEC
1
2
3
4
8
9
7
6
5
Fig. 3.1 Scope of delivery for ecoTEC plus 600 series
DO NOT remove the boiler from the polystyrene base at
this stage.
Item Quantity Description
1 1 Appliance holder
2 1 Appliance
3 1 Lower appliance cover
4 4 Connecting pipes (gas, heating, safety valve)
53
Maintenance taps (gas, heating flow and
return)
1 Bag with literature (Item 6 - 8)
6 1 Assembly template
7 1 Benchmark logbook
83
Operating, installation, maintenance manual
andassembly manual for flue pipe
92
Bag with small items: 4 wooden screws,
4 plugs 10x60 mm, 4 plain washers, 2 gaskets
R3/4, 1 gasket R1/2, 1 union nut
2
For liquid gas appliances, extra: 1 sticker each
for tank and ventilation (above Fig.)
Table 3.1 Scope of delivery for ecoTEC plus 600 series
1
2
3
4
6
5
8
9
7
Fig. 3.2 Scope of delivery for ecoTEC plus 800 series
DO NOT remove the boiler from the polystyrene base at
this stage.
Item Quantity Description
1 1 Appliance holder
2 1 Appliance
3 1 Lower appliance cover
46
Connecting pipes (gas, heating, water, safety
valve)
54
Maintenance taps (gas, heating flow and return,
cold water with filling pipe)
1 Bag with literature (Item 6 - 8)
6 1 Assembly template
7 1 Benchmark logbook
83
Flue system operating, installation, mainte-
nance and assembly manual
92
Bag with small items: 4 wooden screws, 4 plugs
10x60 mm, 4 plain washers, 42 gaskets R3/4,
1 gasket R1/2, 1 union nut, 1 O-ring seal, 2 grips
with countersunk screws, 1 clamp
2
For liquid gas appliances, extra: 1 sticker each
for tank and ventilation (above Fig.)
Table 3.2 Scope of delivery for ecoTEC plus 800 series
General requirements 3