Preparation of the bus roof Installation instructions REVO-E
24
3 Preparation of the bus roof
When working on the bus roof or on any hoisting equipment,
scaffolding etc. suitable safety precautions must be taken to pre-
vent falls.
Wear protective gloves!
3.1. Roof cut-outs
The required roof cut-outs (openings for water connection, connection
for refrigerant, connection for the condensate, electrical interfacing,
ambient air intake, blow-out opening, holes for attachment) must be
clearly indicated on the roof.
NOTE: Drawings and documents can be obtained from Valeo!
Figure 2:
Warning!
Risk of serious injury or death
from falling down!
Danger of cut injuries due to
sharp metal edges!
Caution!
Figure 3: