EasyManua.ls Logo

Valor 541 - 6 Unpacking and Preliminary Checks; Unpacking

Default Icon
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. UNPACKING AND PRELIMINARY CHECKS
6.1 Unpacking.
1 Main fire assembly.
1 Fascia (Attached to fire).
1 Ceramic fuel effect (Packed in the fire).
1 Nut & olive for 8mm inlet pipe.
1 Front casting and ash pan pack (Decadent
and Dream models only).
1 Flue unit.
1 Wall fixing template.
2 Fire retaining cables.
2 Fibre wall plugs.
2 Self tapping screws.
Page 18
© GDC Group Ltd. 2014
INSTALLER GUIDE
1 Controls heat baffle (Chic)
3 Edge clips for controls heat
baffle
8 Woodscrews.
8 Plastic wall plugs.
1 Length of flue sealing tape.
1 Literature pack.
4 Batteries 1.5V AA.
1 Terminal guard (supplied flat).
2 Eyebolts.
Figure 6.

Table of Contents