EasyManua.ls Logo

Vatech PCH-30CS - Page 69

Vatech PCH-30CS
152 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Installing the Equipment: Base Stand (Optional)
PaX-i Plus / Insight (Model: PCH-30CS) Installation Manual 59
English
Leveling the Front and Back
1. Place the Spirit Level on the Vertical Frame, as shown in the following figure.
2. Adjust the screws until the bubble of Spirit Level centers (level), by turning the
front and/or back screws clockwise or vice versa.
3. When the leveling is completed, make sure that all eight set screws touch the
floor by turning them clockwise if necessary.
4. Assemble the vertical top cover.
5. Assemble the case column front.

Table of Contents

Other manuals for Vatech PCH-30CS

Related product manuals