EasyManua.ls Logo

Vatech PCH-30CS User Manual

Vatech PCH-30CS
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image

Table of Contents

Other manuals for Vatech PCH-30CS

Question and Answer IconNeed help?

Do you have a question about the Vatech PCH-30CS and is the answer not in the manual?

Vatech PCH-30CS Specifications

General IconGeneral
Focal Spot0.5 mm
Image SensorCMOS
Current10 A
TypeCone Beam CT
X-ray Tube Current4 mA
Field of View (FOV)5x5 cm, 8x8 cm
Voxel Size0.08 mm - 0.30 mm
Scan Time9 - 24 seconds

Summary

Important Notes

Installation and Safety Precautions

Details key precautions for installation and operation, including temperature and handling.

Consequences of Ignoring Manual

Highlights risks of physical injury or equipment damage if manual is not understood.

1. Introduction

Manufacturer's Liability

Outlines conditions under which the manufacturer assumes liability for installation and operation.

2. Choosing an Installation Site

Room Requirements

Specifies the necessary room conditions, including space, stability, and floor requirements.

Specifications for Electrical Installation

Details electrical installation requirements and guidance notes.

Electrical Requirement

Outlines mandatory and recommended electrical connections and power specifications.

3. Before Installing the System

Unpacking Boxes

Details the components included in each main box and how to unpack them.

Checking the Parts

Provides a layout and list for verifying all parts and accessories are present.

4. Installing the Equipment: Base Stand (Optional)

Unloading Base and Main Unit

Guides on safely unloading and handling the main unit from its packaging.

Assembling Base with Column Unit

Details the procedure for attaching the base unit to the main column.

Installing Wall and Column Brackets

Guides on attaching wall and column brackets to the equipment.

Fixing the Base (Optional)

Explains how to secure the base unit to concrete or wooden floors.

5. Installing the Equipment: Wall Mount

Leveling the Equipment

Details the process of leveling the equipment using a spirit level for wall mount.

7. Setting up PC

Recommended PC Requirements

Specifies the hardware and software requirements for the PC.

8. Setting up PC’s Environment Variables

9. Installing Software

Installing the InstallPakage

Step-by-step instructions for installing the main software package.

Disabling the Packing Mode

Procedure to exit the equipment's factory default packing mode.

Appendix A

Installation Checklist

A comprehensive checklist for pre-installation, unboxing, and installation steps.

Related product manuals