EasyManua.ls Logo

Vertiv Liebert EFC - Preliminary Operation; Safety Information WARNING; Equipment Inspection; Packing Material

Vertiv Liebert EFC
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7VERTIV™ - Liebert
®
EFC - UM - 10040805MAN_ENG - 30.03.2023



Risk of top-heavy unit falling over! 
      
Read all of the following instructions before attempting
to move, lift, remove packaging, or preparing unit for
installation.

      
 Only properly
trained personnel wearing appropriate safety headgear,
gloves, shoes, glasses and safety sling hook on
󰀨
lift, remove packaging from the unit or prepare the unit
for installation.


 The unit may be too tall to go
through low and narrow passageway. Measure the unit
and doorway heights and refer to the installation plans
prior to moving the unit to verify clearances.

 Keep the
unit protected from water before unit ducts installation.

The unit will always be shipped in two packages, one
containing the unit and one containing the process fans
module.

Do not walk on unit’s top

Upon arrival of the unit, and before unpacking, verify that the
labeled equipment matches the Bill of Lading.
Carefully inspect all items for either visible or concealed damage.
Damage should be immediately reported to the carrier and a

representative.

All material used to package this unit is recyclable. Please save for
future use, or dispose of the material appropriately.


The operators must wear helmet, safety shoes, gloves.
Place two lifting tubes in the holes indicated on the
unit basement. The capacity of the lifting tube must be
adequate to support the unit load.
Remove lifting tubes after unit installation.
The unit basement holes diameter is 56 [mm].

Do not lift the entire unit using eyebolts placed on fan
module top.

Risk of heat exchanger damage due to UV exposure:
Before assembling the fan module, and during all the
transport and storage operations, it is mandatory to keep
the composite heat exchanger protected from direct and
      󰀨
the heat exchanger material.

Table of Contents

Related product manuals