TABLE OF CONTENTS
1 Important Safety Instructions 1
2 Mechanical Installation 3
2.1 Pre-Installation Planning 3
2.2 Preliminary Checks 3
2.3 Environmental Considerations 3
2.3.1 Battery Room 3
2.3.2 Storing the UPS and Batteries for Delayed Installation 4
2.4 Positioning 4
2.4.1 Moving the Cabinets 4
2.4.2 Clearances 4
2.4.3 Raised-Floor Installations 5
2.4.4 Removing Shipping Bolts 5
2.5 System Configuration 6
2.6 Installing a Junction Cabinet 8
3 Electrical Installation 11
3.1 Grounding Configuration for Battery Systems 11
3.2 Connecting EquipmentGroundCablesandStraps 11
3.3 Interconnecting Battery Cables inaTop-Terminal Cabinet 12
3.4 Interconnecting Battery Cables inaFront-terminalCabinet 13
3.5 Connecting DC Input Power 15
3.6 Control Cabling 19
3.6.1 Connecting to Liebert EXL S1 20
3.6.2 Connecting to Liebert EXL 21
3.6.3 Connecting to Liebert NX 22
3.6.4 Connecting to Liebert NXL 24
3.6.5 Connecting a Vertiv™ Battery Monitoring System 25
3.6.6 Connecting an External Room Temperature Sensor 28
4 Specifications 29
i