EasyManua.ls Logo

VEVOR LB300A - Water Supply; Purge

VEVOR LB300A
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Safety Tips
Number: JT190199990 Version Number: A1
Note: Subsequent versions of this specification are subject to change without prior notice. Thank you
5/23
Water supply/Purge
6. Water supply/ Purge
Warning
Ice makers shall be installed in
accordance with safety standards and shall
not be installed on the aisles of public
buildings.
6.1 Water supply
With local potable water quality,
determining if a water treatment system is
needed to prevent sediment formation,
filtering out impurities and removing
bleach smell .
Please install water supply pipe according
to below instruction :
Don't connect ice maker to hot water
pipe;
Water supply pressure range is 1bar~
5bar. Using water pressure regulator
for water supply pressure over rang.
Individual water faucet must be
installed for ice maker.
6.2 Purge
When installing drain hose, follow these
guidelines to be sure all purged water
flowing into gully drain:
The main gully drain capacity shall be
enough for all drain water:
Drain hose should be wrapped with
insulation material to prevent
condensation.
The drain hose of the water-cool
condenser and the drain hose of ice
bin should be placed separately
About 2.5 centimeters drop needed
for each one meter additional drain
hose and must not be bent

Related product manuals