EasyManua.ls Logo

VGE MultiMax Pro - Start-Up Procedure

VGE MultiMax Pro
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VGEM000-GB192
VGE International B.V.
Ekkersrijt 4304
5692 DH Son Netherlands
+31 499 461099
info@vgebv.nl
www.vgebv.nl Pag. 49/68
Installation & User Manual
7.4 Start-up procedure
If the UV system is completely mechanically, hydraulically and electrically installed, the UV system can be
put into operation according to the instructions in the table below.
Nr.
Task description
1
Fill the piping system and the irradiation chamber complete with water, making sure that the
system and the irradiation chamber are completely vented.
2
Measure the supply voltage and check whether it corresponds to the specification on the type
plate.
3
Make sure that water flows through the irradiation chamber.
4
Plug in the power cord.
5
Ensure that the connector is placed with the wire bridge or with the flow switch connection.
6
If the supply voltage and the connector with wire bridge (or active flow switch) are present, a built-
in time relay will become active and the lamp will switch on after approximately 10 minutes.
7
Wait until the waiting time and the warm-up time have elapsed (max. 3 minutes) and check at the
lamp socket if the lamp is burning.
8
Instruct the servant staff.

Table of Contents