Operator’s Manual Backhoe Series BH - Page 45 of 91 - Version 2.0
◼ Position the unit, so the Backhoe
swing post is over the centerline of
the trench connection.
◼ Dig with the Backhoe at extreme
swing positions and as close to the
stabilizers as possible.
◼ Pile the spoil on the opposite side of
the trenches.
◼ Position the unit forward with the
lift and crowed levers so the two
trenches can be connected.
◼ Pile the spoil on the opposite side of
the trench.
Side slope excavating or trenching
◼ Dig with a backhoe uphill whenever
possible.
◼ Level the backhoe on slops with the
stabilizers to dig plumb trenched, or
use the backhoe or loader to cut a
level slot for the uphill wheel and
stabilizer. Pile the soil from the
space on the low side.