EasyManua.ls Logo

Victron energy BlueSolar PWM-Pro SCC010010010 - Installation and Operation

Victron energy BlueSolar PWM-Pro SCC010010010
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
3. Installation and operation
- The controller is a common positive controller.
- If system grounding is required, preferably the positive pole of the battery
should be grounded.
- Use one system ground only.
Charging Status LED indicator Load Status LED indicator
Battery Status LED indicator Switch Button
Important note: always connect the battery first, in order
to allow the controller to recognize system voltage.

Related product manuals