Flue location
and ventilation
A Secondary ventilation
B Flue gas
C Inspection aperture
D Ventilation aperture
E Combustion air
Open flue operation
Part no. 60/100 80/125
1 Boiler flue connection
2 Standard duct pack Comprising: 7373211 7194305
Support bend
Support rail
Duct cover
Spacers (3 pce.) 7176729 7147033
3 Flue Pipe
2 m long
1 m long
0.5 m long
Flue bend (for use in corbelled chimneys)
30° 7373220 7194316
15° 7373221 7194317
4 Inspection piece, straight 7373216 7194312
5 Balanced flue bend
87° 7373218 7194314
2 x 45° 7373219 7194315
or
Balanced flue inspection tee
87°
6 Ventilation bezel 7176728 7176634
Balanced flue pipe
1.95 m long 7373212 7194308
1 m long 7373214 7194310
0.5 m long 7373215 7194311
2
A
Combustion air
B
Flue gas
C
Inspection aperture
6
Part no. 60/100 80/125
1 Boiler flue connection
2 Standard duct pack Comprising: 7190564 7194304
Support bend
Support rail
Duct cover
Spacers (3 pce.)
3
Inspection piece, straight (for installation into 7190561 7194318
the flexible flue (optional))
4
Flexible flue
8 m long 7190559 7147039
12.5 m long 7190558 7147038
5
Connecting pipe, for the connection of residual 7190562 7194319
length of the flexible flue
Pipe lowering attachment with 20 m rope 7190563 7147036
6
Balanced flue inspection piece, straight 7373228 7199781
7
Wall bezel 7176760 7176662
8
Balanced flue pipe
1 m long 7373224 7194321
0.5 m long 7373223 7194320
9
Balanced flue bend
87° 7373226 7194323
2 x 45° 7373227 7194324
or
Balanced flue inspection tee
or
Balanced flue inspection bend
87° 7373229 7199782
Balanced flue sliding coupling 7373236 7194329
10
Balanced flue operation