30
Holiday program
Condition: ”Holiday mode Yes” must be configured (see page 26).
Eight different holiday periods with start and stop times may be set up in the holiday program.
Holiday program (multiple-boiler control unit)
The holiday period begins on 16/07/2002 and ends on 15/08/2002.
Please note:
Room temperatures during the holiday period can be adjusted in the ”Nominal values”
menu.
In the ” Operating data” menu you can scan whether the control unit is set to
”Timer program holiday mode”.
Party mode (”Clock override”)
A switching contact at the party switch input (”Clock override”) enables the control unit to change to normal
mode. The control unit will operate in normal mode as long as the switching contact is closed.
Nominal value (multiple-boiler control unit)
The impulse at the party switch input (”Clock override”) lets the control unit operate
in normal mode for the set period.
Please note:
The course of the set normal mode cannot be terminated prematurely.
The control unit can be changed to normal operation for an adjustable period by connecting a push-button to
the party switch input (”Clock override”). After the set period has expired, the control unit will automatically
change back to its previous setting.
In the ” Operating data” menu you can scan whether the control unit is set to ”Clock override time”.
5285 565 v1.35285 565 v1.3
1: 16-07-2002
up to 15-08-2002
Clock override
time 0n