19
Table of contents
Important!
Please read these installation instructions carefully before
installation.
The System has been tested using the following regulations
and is entitled to bear these symbols.
Type EN03
•
TÜV Rheinland
I
D
:
1
0
0
0
0
0
0
0
0
0
®
Chapter Title Page
Schematic drawing 20
1. General information 21
1.1 Installation instructions 21
2. Water installation 22
3. Electrical installation 22
3.1 Schutzbereich VDE 0100 Teil 701 22
3.2 Electrical installation diagram 23
3.3 Earthing 23
3.3.1 Connections diagram 24
4. Dry running protection system 24
5. Leakage test 25
6. Equipment 25
7. Final Blowing 25
8. Electric heating 2 kW optional 26
9. Checklist 27
10. Inspection openings required on site 28
11. Instruction for use 30
12. Introduction 30
13. Keypad 30
13.1 Automatic system shut-down 31
14. Desinfection 32
15. Instruction for using and care 33
15.1 Drain/Over ow tting with rotary knob 34
15.2 Over ow regulator 34
15.3 Air oor nozzle 35