EasyManua.ls Logo

Vinten Osprey Plus - Page 15

Vinten Osprey Plus
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Installation
1. Push the control valve (2) in and turn 90° counter clockwise to the
midway position between PUMP and WORK and release, pause for
5 seconds and allow the top stage to rise fully.
!
WARNING! A pressurized pedestal will rise rapidly if the control valve is set to WORK. Do not move the control valve directly from
PUMP to WORK.
2. Push the control valve (2) in and turn 90° counter
clockwise to the WORK position. Install the camera mount
and payload and balance the load as described Fitting
and balancing the Payload on page 16.
20
18
20
18

Related product manuals