EasyManua.ls Logo

Vision REVO - Page 98

Vision REVO
122 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth Power Your Vision
98
Figure 11.1-2 Normal start without junction box
Step 1: Start installing batteries, ensure the battery power cables are correctly connected
and the communications cables have an anti-freeze mechanism. Connect the cables
according to COM1/COM2.
Step 2: Before starting the system, set the DIP codes of CBMS and GBMS. Dip rules have
been put in the manual.
Step 3: Double check the connection of cabinets are corrected
Step 4: Start the cabinets. Check the self-check status of all cabinets when powered on
separately.
Step 5: When the self-test is successful, a sound will appear, and the indicator light will turn
green and keep on. Proceed to step 6.