EasyManua.ls Logo

Wacker Neuson BPS Series

Wacker Neuson BPS Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
7.3 Putting into operation with Briggs & Stratton engine
1
1. Check engine oil fill level1, see Maintenance on page 37.
2
A
2. Move the fuel cock2 into positionA.
A
3
3. Move choke lever 3 to position A when the engine is cold.
4
A
4. Move the throttle lever 4 into position A.
34 Operator’s Manual | BPS1030B, BPS1135B, BPS1340B, BPS1550B, BPS2050B | BPS | 5100066824 | 04/2023 |
Version: 5 | [en-US]

Related product manuals