EasyManua.ls Logo

Wacker Neuson BPS Series

Wacker Neuson BPS Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
Maintenance plan 9.2
9.2 Maintenance plan
NOTICE
Danger of engine damage!
When commissioning new machines, an oil change must be carried
out once after 20 operating hours.
Maintenance work daily monthly 100h 125h 300h 500h
Clean the machine.
Visual check for completeness.
Visual check for damage.
Check engine oil fill level.
Check air filter intake area.
Check screw connections.
Check the fuel level
Clean and check air filter.
Check V-belt tension.
Cleaning the deposit cup.
Change engine oil.
Check spark plugs.
Clean fuel filter.*
Check rubber buffer .*
Check valve clearance.*
Replace fuel filter.*
* Have this work carried out by a service partner.
9.3 Maintenance work
Carrying out preparations:
1. Place the machine on a level surface.
2. Decommissioning the machine.
3. Let the machine cool down.
9.3.1 Cleaning the machine
Observe the following when cleaning the machine with a high-
pressure cleaner:
1. Do not aim high-pressure cleaner directly at air intake area and
electrical components.
2. Do not hold the high-pressure cleaner too close to the machine in
order to avoid damage to labels and sensitive components.
[en-US] | Version: 5 | 04/2023 | 5100066824 | BPS1030B, BPS1135B, BPS1340B, BPS1550B, BPS2050B | BPS |
Operator’s Manual 39
9

Related product manuals