EasyManua.ls Logo

Wacker Neuson BPS Series

Wacker Neuson BPS Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
Putting into operation with Briggs & Stratton engine 7.3
5
A
5. Move the engine switch5 into positionA.
6
6. Pull the starting handle 6.
ð Pull the starting handle slightly until resistance is felt, then pull it
strongly. Slowly return the starting handle.
ð Engine runs.
B
7. Move choke lever to position A for starting, move choke lever back
to position B while the engine is warm.
ð The machine is ready for operation.
[en-US] | Version: 5 | 04/2023 | 5100066824 | BPS1030B, BPS1135B, BPS1340B, BPS1550B, BPS2050B | BPS |
Operator’s Manual 35
7

Related product manuals