Commissioning
Tests before commissioning 7.2
29
[en] | 07/2022 | 5100056271 | BS-2 | Operator’s Manual
CAUTION
Risk of injury and material damage due to recoil!
On firm, hard or unyielding floors, injuries and material damage may res-
ult from strong rebounds.
Avoid hard or unyielding floors.
CAUTION
Risk of collapse and spillage!
There is a risk of injury from falling or spilling when working on fracture,
pit, dump and embankment edges, on trench edges and heels.
Pay attention to side walls and their stability.
Ensure stability.
7.2 Tests before commissioning
Information
Further information and detailed descriptions, see Maintenance on
page 33.
Perform the following checks:
Check machine and components for damage.
Do not put the damaged machine into operation. Damages and
defects must be repaired immediately.
Check the fuel level.
Check engine oil fill level.
Check to ensure the screw connections are firmly seated.
Check control elements for functionality.
Check the air intake area for dirt.
7.3 Putting into operation
CAUTION
Hot exhaust!
Contact may cause burns.
Only operate the machine if the safety features are correctly fitted.
Do not change or remove safety devices.
7

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson BS-2 and is the answer not in the manual?

Wacker Neuson BS-2 Specifications

General IconGeneral
BrandWacker Neuson
ModelBS-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals