12.2 Transport roller installation
46
Operator’s Manual | BS-2 | 5100056271 | 07/2022 | [en]
Transport trolley
For easier transport on the construction site.
Transport roller
For easier transport on the construction site.
12.2 Transport roller installation
1
2
ü Machine is switched off.
1. Place the machine horizontally on a flat surface with sufficient load-
bearing capacity.
2. Secure machine against overturning.
3. Align half shells 1 in the middle.
4. Attach the half shells with four screws 2 to the guide bracket.
5. Tightening torque 1.5 Nm.