EasyManua.ls Logo

Wacker Neuson ET16 - Page 138

Wacker Neuson ET16
248 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-36 BA ET16 de* 1.0 * et16b510.fm
5 Operation
1. Move the attachment inward completely and position it at 5–10 cm (2–
4 in) above the ground.
2. Unlock switch D and press it to position 1.
The quickhitch is enabled and the buzzer sounds.
3. Press and hold the foot-operated touch button E and at the same time
pull back the J dozer blade lever.
The quickhitch opens.
Check pin F must be fully extended.
4. Retract the bucket cylinder.
The attachment is lowered to the ground.
Fig. 165
D
1
Fig. 166
E
J
Fig. 167
F
Fig. 168

Table of Contents

Related product manuals