LTV Operation
Continued from the previous page.
Operating the
lights
Perform the procedure below to operate the lights.
1. Turn on the main circuit breaker (a).
2. Turn on individual circuit breakers (c) one at a time.
Notes
Metal halide floodlights require a warm-up time of 5–15 minutes before they
reach full brightness.
After turning the lights off, a cool-down time of 10 minutes is necessary before
they can be turned on again.
Stopping the
machine
NOTICE: Turn off the lights before stopping the engine. Failure to do so will
damage the electrical system.
Perform the procedure below to stop the machine.
1. Disconnect all loads from the machine.
2. Turn the circuit breakers (a) off.
3. Push the STOP button (e) to de-energize the fuel solenoid.
wc_gr013779
a
b d
c
g
h
f
e
8K

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson LTV6L and is the answer not in the manual?

Wacker Neuson LTV6L Specifications

General IconGeneral
BrandWacker Neuson
ModelLTV6L
CategoryWork Light
LanguageEnglish

Related product manuals