wc_tx003253gb_FM10.fm
23
P 35A Operation
4.2 Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Add fluids as needed and applicable, including fuel, engine oil, hydraulic oil,
retardant, and battery acid.
5. Move the machine to its operating location.
6. Connect component parts not already attached.
4.3 Position of the Operator
Safe and efficient use of this machine is the operator’s responsibility. Full control of
the machine is not possible unless the operator maintains the proper working
position at all times.
While operating this machine, the operator must:
■ stand between the handles, facing the engine
■ grasp the adjustable handle grips with both hands, using the fingers of the right
hand to squeeze the throttle control
■ walk backwards while pulling the screed across the wet concrete