EasyManua.ls Logo

Wacker Neuson RS 800A - Lifting and Handling the Machine

Wacker Neuson RS 800A
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance RS 800 /...
wpm_tx001254gb.fm 36
5.13 Transporting the Machine
See Graphic: wc_gr001021
Before transporting the machine, place blocks in front of and behind
each drum. Use the front tie-downs (a) to secure the machine to the
trailer. Lift handle (b) into upright position.
Never use any other part of the roller to tie the machine down, as
severe damage may occur.
CAUTION
wc_gr001021
a
a
b

Related product manuals