Innovation - Edge [i] Installation, Operation, Maintenance Manual
CHAPTER 8 – WATER HEATER MANAGEMENT
OMM-0143_A • GF-216 • 9/6/2019 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page 122 of 170
TABLE 8-6g: Operating Controls → Lead/Lag Control Parameters
Available Choices or Limits
Run Hours, Unit Size,
Select Lead/Lag
Determines how the Lead and Lag units will be selected.
Specify the number of hours after which the Lead unit is rotated.
Specify the address of the Lead unit.
Specify the address of the Lag unit.
Figure 8.6-7: Operating Controls: Lead/Lag Control Screen
8.7 WHM HARDWARE INSTALLATION & SET-UP
INSTRUCTIONS
The following sections provide the basic installation and set-up instructions for implementing a
Water Heater Management System (WHM) to control up to 16 AERCO Innovation Water
Heaters. Some of the descriptions and procedures included in Chapter 2 are repeated here to
avoid unnecessary referencing.