2.10.1.6 Time profile ash compression (Exklusiv version only)
The ash in the ash pan is only compressed at the 2 set start times
and when approx. 15 kg of fuel has been consumed. The start times
can be set in steps of 15 minutes (start time 1 and start time 2).
Factory setting: Start time 1: 08:00
Start time 2: 22:00
Pressing one of the six buttons switches the lighting and display
on – Fig. 104.
Fig. 104
Fig. 105
Fig. 106
Fig. 107
Press the
Menu
button – Fig. 105.
Confirm the selected menu item „Operator level“ by pressing the
Choose
button – Fig. 106.
Use the
arrow
buttons to select the sub-menu item „Time profile
ash comp.“ – Fig. 107.
Confirm the selected sub-menu item „Time profile ash comp.“ by
pressing the
Choose
button – Fig. 108.
Fig. 108
Boiler cleaning
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Choose Back
Boiler temperature
(Operating phases)
Lighting ON
42
°C
Boiler temperature
(Operating phases)
Info Menu
42
°C
Operator level
Service level
Choose Back
Operation
Boiler cleaning
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Choose Back