Output (heating) | 32 kW |
---|---|
Output (hot water) | 50 kW |
Fuel Type | Natural Gas |
Height | 780 mm |
Max working pressure | 3 bar |
Warranty | 5 years |
Key symbols and essential warnings for safe operation and installation.
Mandatory safety measures and adherence to building codes for installation.
Overview of the boiler package contents and model features.
Specifications including capacities, connections, and electrical details.
Diagram and list of the boiler's internal and external parts.
Procedures for flushing and preparing the heating system before boiler installation.
Requirements for electrical connection, including voltage and cable specifications.
Guidelines for installing the oil storage tank and supply pipework.
Requirements for open vented and sealed central heating system pipework.
Installation details for condensate and pressure relief discharge pipes.
Recommended spacing around the boiler for installation and service.
Minimum dimensions and siting requirements for flue terminals.
Specific installation requirements for conventional flue systems.
Guidelines for installing room sealed and balanced flue configurations.
Step-by-step instructions for safely removing the boiler from its packaging.
Diagrams showing connection points and flue opening requirements.
Procedures for physically installing the boiler unit.
Instructions for connecting and installing the flue system.
Details on accessing and ensuring correct fitting of combustion chamber components.
Step-by-step guide for connecting water, oil, and condensate pipes.
Installation and settings for Riello oil burners.
Installation and settings for Bentone Sterling oil burners.
Procedures for reassembling boiler components after installation.
Instructions for connecting the boiler's electrical supply and controls.
Final checks before starting the boiler.
Steps for filling the central heating system with water.
Initial procedures for starting the boiler and priming the oil system.
Specific starting sequence and checks for Riello RDB burners.
Specific starting sequence and checks for Bentone Sterling burners.
Instructions for flushing the system and adding inhibitor.
Final steps and handover procedures after commissioning.
General procedures for annual boiler inspection and maintenance.
List of spare parts for Riello RDB burners.
List of spare parts for Bentone Sterling burners.
General troubleshooting table for common boiler problems.
Diagnostic flowchart for Riello control box issues.
Diagnostic flowchart for Satronic control box issues.
A checklist to ensure all commissioning steps are completed.
Log for recording routine boiler servicing history.