Commissioning Cond 7110
10 ba75927e03 04/2012
3 Commissioning
3.1 Scope of delivery
Cond 7110 meter
4 batteries 1.5 V Mignon type AA
Power pack
Stand
Stand holder
Short instructions
Detailed operating manual (4 languages)
CD-ROM with detailed operating manual
3.2 Power supply
The Cond 7110 is supplied with power in the following ways:
Mains operation with the supplied power pack.
Battery operation (4 x alkaline manganese batteries, type AA)
3.3 Initial commissioning
Perform the following activities:
Insert the supplied batteries
Connect the power pack (mains operation)
Mount the stand
Switch on the meter
(see section 4.2 S
WITCHING ON THE METER, page 15)
3.3.1 Inserting the batteries
You can operate the meter either with normal batteries or with
rechargeable batteries (Ni-MH).
In order to charge the batteries, an external charging device is
required.