Cond 7110 Operation
ba75927e03 04/2012 15
4.1.4 Socket field
4.2 Switching on the meter
1. Switch on the meter with <On/Off>.
The meter performs a self-test.
2. Connect the sensor.
The meter is ready to measure.
4.3 Switching off the meter
1. Switch off the meter with <On/Off>.
The meter is switched off.
1 Conductivity measuring cell
2 Power pack
3 Service interface
When the meter is powered by the batteries, it switches itself
off automatically after an adjustable interval to save the bat-
teries (see section Automatic switch-off function, page 27 ).