EasyManua.ls Logo

YOKOGAWA FLXA21

YOKOGAWA FLXA21
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
IM 12A01A02-12E 9th Edition : Mar. 23, 2018-00
(Note) The universal mounting kit (/UM) contains the pipe and wall mounting hardware (/U) and the panel
mounting hardware (/PM).
Panel mounting hardware (Option code: /PM, /UM)
2-M5 length 35
185
178
100
195
135
Panel thickness
1 to 12
Spacing panel cutout
4-M6 *
138
+1
0
138
+1
0
FB4_03.ai
Unit: mm
*: Tighten the four screws to a torque of 2 N•m.
Wall mounting hardware (Option code: /U, /UM)
144
164
13
100
70
144
224
200
50
15
For wall mounting
3-ø10 holes
4-M6 *
FB4_02.ai
Unit: mm
*: Tighten the four screws to a torque of 2 N•m.
Note: The wall on which the analyzer is mounted should be strong enough to bear the weight of more than 8 kg.
Pipe mounting hardware (Option code: /U, /UM)
151
100
200
50 174
144
(205)
Pipe mounting (Horizontal)
Pipe mounting (Vertical)
Pipe 50A
(ø60.5)
M8 U-bolt
4-M6 *
FB4_04.ai
Unit: mm
*: Tighten the four screws to a torque of 2 N•m.

Other manuals for YOKOGAWA FLXA21

Related product manuals