EasyManua.ls Logo

YOKOGAWA ProSafe-RS

YOKOGAWA ProSafe-RS
207 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Transportation, Storage and Installation
2-48
TI 32P01J10-01EN
Mounting conditions
Do not mount the IOBP/IOBP_IS so that its heat-generating part (Barrier or I/O) is located
immediately under the N-ESB Bus module (S2EN501). The IOBP/IOBP_IS may be
mounted immediately under the power supply of the NIU (S2PW50x).
The NIU shall be mounted with a 2-unit or more space from the ceiling of the junction box.
A 2-unit or more space shall be provided between the NIU and IOBP/IOBP_IS.
To mount heat-generating devices other than NIU and IOBP/IOBP_IS shall be mounted with
30-mm intervals on the right of the NIU on the top shelf. The specications of the devices
shall be observed.
The following shows how to mount N-IO nodes (mixture of Intrinsic Safety barrier and Non-
Intrinsic Safety barrier) in a junction box:
F020533.ai
Junction Box
NIU
Heat-generating
device mounting area
(max. 20 W)
IOBP_IS
IOBP
Non-mounting area (2 units or more) /
Wiring is possible
Non-mounting area
/ Wiring is possible
(30 mm or more)
Heat-generating device non-mounting
area (under the N-ESB Bus module)
Wiring is possible
Field wiring area
Wiring area
NIU
Power supply unit
Power supply unit
IOBP
2units or more
1unit or more
Non-mounting area
Figure Example of Mounting N-IO Nodes (Mixture of Intrinsic Safety Barrier and Non-Intrinsic Safety
Barrier) in a Junction Box
CAUTION
The wiring that will be intrinsic safety circuits must be installed so that they are electrically
separated from the wiring of non-intrinsic safety circuits, including the in-cabinet wiring. Install the
wiring according to the IEC 60079-14 standards or the requirements for explosion-proof wiring of
the country where the system is used.
Mar. 29, 2019-00

Other manuals for YOKOGAWA ProSafe-RS

Related product manuals