EasyManua.ls Logo

York Sun Select YV28 - Rigging and Handling

York Sun Select YV28
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging and handling
Exercise care when you move the unit. Do not
remove any packaging until the unit is near the
place of installation. To rig the unit, attach chain or
cable slings to the lifting holes provided in the base
rails. You must use spreader bars across the top of
the unit. The spreader bars must have a length that
exceeds the largest dimension across the unit.
CAUTION
If a unit is installed on a roof curb other than a YORK
roof curb, you must apply gasketing to all surfaces
that come in contact with the unit underside.
CAUTION
Before lifting the unit, make sure that the unit weight is
distributed equally on the rigging cables so that it lifts
evenly.
CAUTION
All panels must be secured in place when the unit is
lifted. The condenser coils must be protected from
rigging cable damage with plywood or other suitable
material.
Installation Manual: YORK
®
Sun
Select YV28 to YV50
13
Johnson Controls Ducted Systems

Table of Contents

Related product manuals