EasyManua.ls Logo

York YMC2 - OSCD and Chiller Operation (0490 A, 0612 A, 0730 A & 1278 A Amp Models)

York YMC2
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JOHNSON CONTROLS
121
SECTION 4 - VSD OPERATION
FORM 160.84-OM1
ISSUE DATE: 9/21/2017
4
OPTISPEED COMPRESSOR DRIVE AND
CHILLER OPERATION (0490A, 0612A, 0730A
AND 1278A AMP MODELS)
When the chiller enters a start command, the OSCD
is commanded to pre-charge, the pre-charge contactor
will close and slowly charge the DC Bus capacitors
through the pre-charge resistors. This is called the
pre-charge period, which will last for 12-seconds. Af-
ter the 12-second time period has expired, the supply
contactor will close and the pre-charge contactor will
open. The supply and pre-charge contactors will re-
main in this state for the duration of the run cycle. The
OSCD logic board provides the commands for the sup-
ply and pre-charge contactors.
All models of HYP drives will control the motor in the
same manner for a normal stop command.

Table of Contents

Other manuals for York YMC2

Related product manuals