3.4 Assembling scaffold towers of sizes 3 and 5
Scaffold towers of size 3 and above should be assembled by at least two persons.
1. Assemble the base unit
(see Assembling the
base unit” on page39).
2. Use a spirit level to en-
sure the scaffold tower
is vertical.
3. Install all four stabilis-
ers and ensure all of
them touch the ground.
For information on positioning
the stabilisers, see “Basic
dimensions” is on page 52.
1.
2.
4. If required, attach bal-
last weights to the sta-
bilisers.
For information on ballast
weights, see “Scaffold towers
and packages incl. ballasting”
is on page 54.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the zarges PaxTower S-PLUS 1T and is the answer not in the manual?

zarges PaxTower S-PLUS 1T Specifications

General IconGeneral
Brandzarges
ModelPaxTower S-PLUS 1T
CategoryConstruction Equipment
LanguageEnglish

Related product manuals