11. Install the platform
centrally and ensure
that the trapdoor is
facing the two-metre
push-on end frame.
The following step only
applies to scaffold towers
of size 3.
12. Install the end and side
toeboards (see “Assem-
bling scaffold towers of
size 2” on page41,
Steps 10 and 11).
The following steps only
apply to scaffold towers of
size 5.
13. Insert the two-metre
push-on end frames
and push them in until
the spring clips snap
into place.
14. Repeat the steps de-
scribed above to install
the advanced guardrails
and platform.
Ensure the platforms'
openings are installed on
alternate sides to allow lad-
ders to be fitted securely.
15. Install the end and side
toeboards.