EasyManua.ls Logo

ZOJE ZJ8800A - Machine Setup and Preparation; Pre-Operation Attention; Machine Fixing and Installation

ZOJE ZJ8800A
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
I Attention
required
before
operation
Attention:
To
avoid machine damaging
or
some accident, please do remember:
1.before using the machine for the first time,please clean it thoroughly, get rid
of
all
the dust and make sufficient lubrication.
2.make sure that
the voltage is right,and that plug and power source are correctly
connected.
3.if the voltage in your country is different from the voltage
of
this machine,please
do not use
it.
4
..
make sure the running direction
of
the motor wheel is right.
S.during the first month when using this machine,you should run it in the normal
speed or lower speed.
--------
----
----
------------
------
----~
Fixing
of
the
machine
F
ig.1
---
B A -
Fig.2 Fig.4
~~
--------------
------~
1.fixing oil tray
1)
oil tray should be put
at
the
four
corners
of
the slot in table plate.
2)
Fix two
arm
cushion"1 "to the"A"side
of
oil tray"3"(facing
the
operator).
Fix the
two
stand
bases
"2"
to
the"B"side
of
oil tray"3"(hinge si
de
),
then
fix
the oil tray"3"(picture1,picture2)
3) Plug the hinge"1"into
hole
of
bed plate, put the machine head on the table
plate,hinge at the
sink
place and then
fix
the machine head
on
cushions
of
the
four
oil tray corners(picture3,pict
ur
e4
).
attention:
i.n
the packing box ,the rubber cushions fixed at the four corner
of
oil tray is not for any other usage
,j
ust for packaging.
- 16 -
From the library of: Superior Sewing Machine & Supply LLC

Related product manuals