EasyManua.ls Logo

ZORN INSTRUMENTS ZFG 3.0 - Page 26

ZORN INSTRUMENTS ZFG 3.0
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual ZFG 3.0
- 24-
For information purposes only, no guarantee of information correctness
Quote from Ril 836, Deutsche Bahn AG (German Rail), (20.12.1999 a)
836.0501
Page 10
Ril 836 - Designing, constructing and maintaining earthworks
Soils body
Principles
1)
Route categories in accordance with module 413.0202
P 300 High-speed transport routes 300 km/h
P 230 Passenger transport routes (ABS) 230 km/h
M 230 Mixed transport routes (ABS) 230 km/h
P 160 Passenger transport routes (I+II) 160 km/h
M 160 Mixed transport routes 160 km/h
G 120 Goods transport routes 120 km/h
R 120 Regional transport routes 120 km/h
R 80 Regional transport routes 80 km/h
G 50 Goods transport routes 50 km/h
2)
Dynamic deflection modulus: Application conditions see Section 6; Para. 5
on soil formation: 1. Value for coarse-grained soils
2. Value for mixed and fine-grained soils
3)
This thickness assumes a hydraulically-bonded based course underneath the solid track of at least 30 cm thickness
4)
Also coarse-grained soils GW, GI, SW and SI; see Module 836.0503, Section 3
5)
If the route is being overhauled for high-speed transport, new construction criteria apply

Other manuals for ZORN INSTRUMENTS ZFG 3.0

Related product manuals