36
Unpacking and Preparations
Before installing the device, make sure that all items listed in the packing list are
present. If something is missing or damaged, please contact ZTE technical support.
Packing List
The MC889 ODU CPE The Quick Start Guide 1 Cover plate kit: Anti-theft
screw*2, Screw anti-theft
removal wrench*1, one
CAT5E Network cable (for
connecting the device and
the POE adapter)
Mounting Kit: Metal
bracket, Backplane, Metal
clamp, M6 expansion
bolts & M6 expansion
spigots*4, M3 crosshead
screws*5
1 POE adapter and AC
Power cord
1 RJ-45 Network cable
(for connecting the POE
adapter and PC/Router)