51
Installation Check
Device Installation:
y
The MC889 is installed rmly.
y
The network cables are installed rmly.
y
The cover plate on the device is installed.
y
The nano-SIM card is installed.
y
The network interface on the POE adapter is installed correctly.
Cables Installation:
y
Verify that all cables are connected properly, cable connectors are secure.
y
Cables should be laid in a clear and straight manner without crossing each
other. There is no obvious curve or slant. Cables do not hang in the air or cross
each other.