EasyManua.ls Logo

Zte MC889 - Installation Check; Device and Cables Installation Check

Zte MC889
68 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
51
Installation Check
Device Installation:
y
The MC889 is installed rmly.
y
The network cables are installed rmly.
y
The cover plate on the device is installed.
y
The nano-SIM card is installed.
y
The network interface on the POE adapter is installed correctly.
Cables Installation:
y
Verify that all cables are connected properly, cable connectors are secure.
y
Cables should be laid in a clear and straight manner without crossing each
other. There is no obvious curve or slant. Cables do not hang in the air or cross
each other.

Related product manuals